Taipa Pump Station Update

Work on the new Taipa sewage pump station continues.  The work now focuses on excavation to build the structure housing the 3 pumps. 

The excavation is approximately 12 meters deep and 25 by 12 meters wide. Later in the project work will begin on the connection pipe networks, revamping and upgrading the existing network.

pump-station-1

Advertisements

Design Services – Welcoming New Challenges

Pengest Internacional has revamped and increased its design team. We can now offer more dedicated and improved design services to our clients. We offer a full spectrum of engineering planning, design, and construction management services, from planning and permitting through preliminary and detailed design to start-up and commissioning for all types of projects.

Our experts are skilled at leading and executing successful, multidisciplinary projects. We are experienced in the coordination of projects with strict management of quality, value, schedule and cost. Our engineering and design services range from planning and permitting through preliminary and detailed design to start-up and commissioning for all types of projects.

New Contract awarded to Pengest Internacional

Pengest is proud to announce that we have been awarded a contract for supervision and construction management for the new bridge connection Macau to Zone A reclamation.

With a history of 3 bridges successfully completed in Macau, Pengest Internacional has been yet again entrusted by the Macau Government to assist in the completion of this important project for the future development of Macau.

The project consists in 2 parallel bridges stretching over the water, linking Hac Sa Wan, Macau to the north most point of the Zone A reclamation area. The project also includes an vehicle overpass and a pedestrian underpass along the breakwater.

map

Multi-functional building for Macau Government at O1 lote in Pac On

Pengest Internacional has been awarded a contract for construction management and supervision of the Multi-functional building for Macau Government at O1 lote in Pac On, Taipa.

The building will have 10 floors and occupy an area of 3536 square meters. It will serve as a multi-functional center with parking, storage and office areas available for government usage.

pac-on-o1

 

Zone A and E1 – Land Reclamation

Taking into consideration the future sustainable development of Macau the New reclaimed land development plan looks to fulfill the future needs of the community with three public systems; open parks and social areas, public services and transportation.

With a total area of 138 and 51 hectares these areas are intended for public and private commercial development. Areas for public housing are also planned as well as parks and social and public services.

  •  The main objectives planed for the areas are:
  • Improving the quality of life of the population,
  • Promoting the diversification of the local economy,
  • Enhancing cooperation and regional growth
  • Promoting cultural diversity
  • Creating a safe and pleasant living environment,
  • Building an ecofriendly transport system,
  • Building new living low carbon living areas
  • Promoting the sustainable development of the Macau SAR.

The land reclamation projects, zone A and E1 are two of our major projects and together with the Macau government we hope to deliver a superior project as a further step for the sustainable development of Macau.