In this Section we present a sample of Pengest Internacional Lda. projects, past, present and future.

Our vision and our mission.

C390A Macau LRT Seac Pai Wan Line

Client: GIT

Start Date: 07/2018

Construction Budget: 131.6M MOP (16.5M USD)

——————————————————————————-

C340A Macau LRT Station 12

Client: GIT

Start Date: 01/2018

Construction Budget: 139M MOP (17.4M USD)

——————————————————————————-

Olympic Avenue Renovation Works and Flyover

Client: GDI

Start Date: 03/2018

Construction Budget: 296.2M MOP (37.0M USD)

——————————————————————————-

Macau – Mainland China Border Gate Bus Terminal Renovation and Upgrade

Client: GDI

Start Date: 02/2018

Construction Budget: 122.8M MOP (15.4M USD)

——————————————————————————-

Bridge linking Zone A Reclamation to New Border Facility Macau – Zuhai – HK Bridge

Client: Department of Infrastructure Development (GDI)

Start Date: 01/2017

Construction Budget: 135M MOP (16.9M USD)

——————————————————————————-

Public Utilities and Pump Station on E2 Reclamation 

Client: DSSOPT

Start Date: 11/2016

Construction Budget: 107.7M MOP (2.2M USD)

——————————————————————————-

Pac On Multi-functional Building

Client: Department of Infrastructure Development (GDI)

Start Date: 11/2016

Construction Budget: 278M MOP (35.0M USD)

——————————————————————————-

Bridge linking Macau to Zone A

Client: Department of Infrastructure Development (GDI)

Start Date: 11/2016

Construction Budget: 305M MOP (38.2M USD)

——————————————————————————-

_MG_1725 small

MGM Resort

Start Date: 08/2016

——————————————————————————-

Kwong Tong Av. Storm Drainage Works 

Client: Public Works Bureau (DSSOPT)

Start Date: 05/2016

Construction Budget: 70.13M MOP (8.77M USD)

——————————————————————————-

New Taipa Sewage Pump Station

Client: Civil Affairs Bureau (IACM)

Start Date: 02/2016

——————————————————————————-

Macau International Airport

Client: CAM

Engineering Consultancy services on various works undertaken by the client

——————————————————————————-

DSC_1147

Zone E1 Reclamation and Seawall

Client: Department of Infrastructure Development (GDI)

Start Date: 05/2015

Construction Budget: 419.47M MOP (52.43M USD)

——————————————————————————-

SVB improv works

Macau Light Rail Transit (LRT) – Sai Van Bridge Improvement Works

Client: Department of Transport Infrastructure (GIT)

Start Date: 04/2014

Construction Budget: 5.0M USD

——————————————————————————-

Hac Sa Beach Drainage Works

Client: Department of Public Works and Transportation (DSSOPT)

Start Date: 12/2014

——————————————————————————-

SEAC PAI VAN Lote CN6b Equipamentos de Apoio Social e de Tráfego

Client: Department of Infrastructure Development (GDI)

Start Date: 07/2013

Construction Budget: 216.86M MOP (27.11M USD)

——————————————————————————-

Zone a 1

Reclamation and Seawall Zone A

Client: Department of Infrastructure Development (GDI)

Start Date: 03/2013

Construction Budget: 1,876.8M MOP (234.6M USD)

——————————————————————————-

landscaping

Coloane Treatment Center

Client: Department of Public Works (DSSOPT)

Start Date: 01/2013

——————————————————————————-

Renovacao terminal ferry1

Client: Department of Public Works and Transportation (DSSOPT) – Remodeling of Macau Exterior Ferry
Terminal

Start: 2013

Description: The construction includes decoration, expansion of the second floor at both East and West Wing; renewal of electrical, AC, fire service, and CCTV system.

Construction Budget: 10.9M USD

——————————————————————————-


tribunal

Client: Department of Infrastructure Development (GDI) – Construction of the Temporary Office Building of the Macau Court of Last Instance

Start: 2012

Description: Low rise building fully equipped
for court offices and conference rooms.

Construction Budget: 4.0M USD

——————————————————————————-

CN3

Client: Department of Infrastructure Development (GDI) – Construction of Public Housing Blocks CN3

Start: 2012

Description: High rise building for a public
house with a total of 925 flats.

Construction Budget: 24.7M USD

——————————————————————————-

_MG_7494

Client: Civic and Municipal Affairs Bureau (IACM)

Start: 2009

Description: New 5 story reinforced concrete building, with underground parking. Facilities for market vendors and respective equipment. Landscaping around the new building.

Construction Budget: 10.0M USD

——————————————————————————-

tunel guia

Client: Department of Public Works and Transportation (DSSOPT) – Guia Tunnel Rehabilitation

Start: 2008

Description: Rehabilitation of a 300 meters long tunnel in Guia Hill.

Construction Budget: 1.0M USD

——————————————————————————-

rotunda ferreira amaral2 rotunda ferreira amaral1

Client: Department of Public Works and Transportation (DSSOPT) – Rotunda Ferreira do Amaral Underground Carpark and Local Road Network

Start: 2005

Description: Underground car park and roundabout.

——————————————————————————-

avenida portas cerco

Client: Department of Infrastructure Development (GDI) – Seawall, Reclamation, Road Access to the Portas do Cerco Border Terminal 

Start: 2003

Description: Reclamation area and stabilization works, road network, storm water drainage works, lighting and road signs.

——————————————————————————-

Sai Van Sai Van B inside

Client: Department of Transport Infrastructure (GIT) – Design and Construction of Sai Van Bridge  

Start: 2002

Description: Suspended cable bridge, with double bridge deck. 6 lanes in the upper deck and 4 in the lower deck.

——————————————————————————-

Cotai logisticas

Client: Department of Infrastructure Development (GDI) – Reclamation and Drainage System for the Logistics Center of Cotai – 1st Phase  

Start: 2002

Description:

• Landfill – 1 101 000 m3,
• Sea Wall – 1,8 km,
• Hydraulic Sand Fill – 256 000 m2,
• Installation of vertical drains with a spacing of
0.5 m
• Stormwater Drainage System.

——————————————————————————-

_MG_7503 - Copy

Client: Department of Infrastructure Development (GDI) – Portas do Cerco Border Terminal   

Start: 2002

Description: Construction of the border building, car parking and bus terminal underground building, roads, infrastructures and gardens, additionally the construction of the border crossings building is equipped with surveillance systems, emergency lighting, computer networks, fire fighting systems, ventilation and air conditioning,elevators and escalators, pump station and other building services.

——————————————————————————-

handover gifts museum1

Client: Department of Public Works and Transportation (DSSOPT) – Construction of the Handover Gifts Museum of Macau  

Start: 2002

Description: Low rise building for the Handover Gifts Museum near Cultural Center in Macau.

Construction Budget: 7.4M USD

——————————————————————————-

Client: Department of Infrastructure Development (GDI) – Construction of the Main Drainage, Sea Wall and Reclamation of the COTAI Logistics Center  

Start: 2002

Description: Reclamation area of 1,357,000m2, 1.8km sea wall.

——————————————————————————-

istmo avenida

Client: Department of Infrastructure Development (GDI) – Construction of Avenue VU3.3 

Start: 2001

Description: Reclamation area of 65,000m2, 2km road and storm water drainage works.

——————————————————————————-

baianossasenhora1

Client: Department of Infrastructure Development (GDI) – Construction of Avenue VU3.2  

Start: 2001

Description: Reclamation area of 65,000m2, 2km road and storm water drainage works, 2 pump stations and box culvert.

——————————————————————————-

ponte lotus1

Client: Macau Government – Construction of the Lotus Bridge Between Macau and Mainland China

Start: 1998

Description: 1500km bridge with prefab spans with a maximum span of 96m.

——————————————————————————-

porto KaHo

Client: MACAUPORT – Construction of the Ka-Ho Deep Water Harbor 

Start: 1998

Description: Construction of a container terminal with 42,000m2, several warehouses and several 40t mobile cranes. Construction of fuel terminal with 14 reservoirs and a total of 86,000m3.

The complex required reclamation works, drainage works and utilities.

——————————————————————————-

autoridade monetaria3

Client: Monetary Authority of Macau

Start: 1998

Description: Design and construction management of a 7 floor and 3 basement new building, including the renovation of an old heritage villa of Macau for the headquarters of the Monetary Authority of Macau.

——————————————————————————-

macau museum

Client: Department of Public Works and Transportation (DSSOPT) – Construction of the Macau Museum at Mountain Fortress

Start: 1996

Description: Construction of 2 basements and one G/F building for the Museum of Macau inside an old Portuguese Fortress, including the construction of the building at the base of the hill for the museum office and a tunnel connecting the two buildings under the Fortress Wall

——————————————————————————-

Bnu-tower01

Client: Banco Nacional Ultramarino – BNU Headquarters Rehabilitation

Start: 1995

Description: Services building with 20 floors, 2 basements incorporating a modern building and a historical facade.

——————————————————————————-

croped aeroporto airport cargo1

Client: Companhia do Aeroporto de Macau (CAM) – MACAU Airport Construction 

Start: 1992

Description: Construction of the reclamation works and artificial island, air cargo building, catering building, maintenance hangar (747-400 tail in), search and rescue complex, extension of the south parking area, general terminal building, engineering and maintenance building, 2nd pomp station, LPG installation, and walkway connection the airport to the adjacent Hotel.

——————————————————————————-

ponte amizade2

Client: Gabinete do Porto e da Ponte – New Macau-Taipa bridge

Start: 1990

Description: 4 lane, 4500m long bridge, including access road network. The bridge crosses 2 navigation channels at a height of 30m and has 4 90m high towers.

——————————————————————————-

terminal porto exterior2

Client: Department of Public Works and Transportation (DSSOPT) – New Outer Harbor Ferry Terminal

Start: 1989

Description: 3 floor, 60,000m2 service ferry terminal building (max capacity of 13 million passengers/year), including access roads, drainage system and utilities. The building’s foundations are of pre-cast piles and includes a heliport with separate platforms.

Underground parking for 600 vehicles as well and the Macau Grand Prix infrastructure complex, which includes 40 race team boxes, offices, 2 pedestrian overpasses, restaurant and race control tower.

——————————————————————————-

ias2

Client: Social Welfare Institute of Macau (IACM) – Construction of the Social Welfare Institute of Macau Building

Start: 1989

Description: Rehabilitation of a heritage villa in Macau.

——————————————————————————-

Pac On

Client: Department of Public Works and Transportation (DSSOPT) – Land Reclamation in Pac-On (2nd Phase)

Start: 1988

Description: 800 000m3 sand filling at the sea with dynamic compaction.

——————————————————————————-

DSOPT_-_novos_aterrosNAPE

Client: Department of Public Works and Transportation (DSSOPT) – Outher Harbor Reclamation – Novos Aterros Porto Exterior

Start: 1987

Description: Construction supervision, water reclamation works.

——————————————————————————-

ponte Nobre

Client: Department of Public Works and Transportation (DSSOPT) – Maintenance and Conservation Works of the Nobre the Carvalho Bridge

Start: 1986

Description: Conservation works of the bridge structure caused by aggressive environment and due to the lack of maintenance since its commissioning in 1974. Several equipment was also update and moved.

——————————————————————————-

bcm

Client: COMPAVE – BCM Headquarters

Start: 1986

Description: Services building with 21 floors and 3 level basement.

 

 


 

 

Advertisements