Coloane Treatment Center

Work continues at full speed at the Coloane Treatment Center. Roof tiles are being placed, the facade of the south block is almost complete, the multimedia rooms are being equipped.

Pretty soon the client (DSSOPT and IAS) will be able to take acceptance of this latest social equipment.

Coloane Tratamento IV

Coloane Tratamento V

Advertisements

Macau Airport Engineering Consultancy Services

Pengest Internacional is providing engineering consultancy services to C.A.M., the Macau Airport managing company.

Installation of the new power room (2000KVA) at the new hangar. Works started in April 2015.

Works include: Trench construction, ventilation ducts & ventilator units, external doors, painting, etc.

Contractor: Empresa Eléctrica, Limitada.