CN3 Final Acceptance Inspection

Pengest Internacional is providing engineering services and consultancy for the CN3 housing project. The CN3 project consists of 4 building blocks with 30 stories an several social areas (kindergarten, disabled association office and living area).

As the project was completed and the residents moved in, changes were required on the original design as well as correcting any small issues detected during the preliminary acceptance inspections. All the stakeholders were present at the inspections, GDI, Pengest Internacional, Contractor, Building Management and E&M consultants.

The final acceptance inspection will be carried out at the end of the week, during this last phase of the works, Pengest Internacional will continue to provide its clients with professional engineering services striving for excellency and their complete satisfaction, as we have always done in the past.

CN3

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s