Macau – Mainland China Border Gate Bus Terminal Improvement and Renovation Works

Work consists of the total renovation of the Border Gate Underground Bus Terminal, including ground level access areas. General safety and usability will be improved for all users of the public facility.

Climate control of the passenger waiting areas will be greatly improved. Fume and bus exhaust extraction will be improved, as well as illumination with the addition of 3 new skylights. These skylights will allow sunlight to enter the underground facility. Offices and driver rest areas will also be renovated to higher standards.

Due to its location and the regular occurrence of flooding in the north part of Macau, especially with the super typhoons in 2017 and 2018 all MEP equipment will be relocated to ground level to guarantee that the facility will greatly reduce the risk of serious damage and unavailability resulting from flooding.

 

Advertisements

New Apple Shop Sands COTAI

Pengest Internacional is proud of the collaboration with ATKINS – SNC Lavalin in the construction supervision of the new Sands COTAI Apple Flagship Store (inauguration in late June 2018).

The Flagstore, designed by ATKINS – SNC Lavalin is almost entirely composed of a steel framed structure with composite (steel and concrete) slabs. Shaped like a cube, the beautifully engineered Apple Store features 3 slender main columns over 2 floors, set approximately 20m apart.

Macau LRT Station 12 Advance Works

Pengest Internacional has been chosen to provide construction supervision services to the Macau Government through the Department of Infra-structure and Transportation. Station 12 will be the first station of the light rail transit system to be built in Macau peninsula.

Station 12 will require an excavation 10 m deep and a diaphragm wall reaching bed-rock at over 30 m. It will connect the Taipa-Macau LRT line to the Barra Transport Interface.

Later the project will comprise of a tunnel linking the Sai Van Bridge and an overrun tunnel for LRT train maneuvers.

Main Bridge Structure Completion Macau – Zone A

On 28 Set 2017 Pengest Internacional together with other main project stakeholders celebrated the completion of the main bridge structure.

This bridge will link the peninsula of Macau to the new reclamation, Zone A also a Pengest Internacional project.

The 500m long, dual two-lane bridge is of the reinforced concrete type with post-tension tendons with 70m deep bored pile foundations.

 

 

 

Taipa Pump Station Update

Work on the new Taipa sewage pump station continues.  The work now focuses on excavation to build the structure housing the 3 pumps. 

The excavation is approximately 12 meters deep and 25 by 12 meters wide. Later in the project work will begin on the connection pipe networks, revamping and upgrading the existing network.

pump-station-1

Design Services – Welcoming New Challenges

Pengest Internacional has revamped and increased its design team. We can now offer more dedicated and improved design services to our clients. We offer a full spectrum of engineering planning, design, and construction management services, from planning and permitting through preliminary and detailed design to start-up and commissioning for all types of projects.

Our experts are skilled at leading and executing successful, multidisciplinary projects. We are experienced in the coordination of projects with strict management of quality, value, schedule and cost. Our engineering and design services range from planning and permitting through preliminary and detailed design to start-up and commissioning for all types of projects.